NSF Certified Black Wire Shelving Starter Unit

  • NSF certified for dry storage
  • Constructed specifically for industrial applications
  • Durable black powder coated finish, chip and corrosion resistant
  • 350 lb. capacity per shelf, available in a number of sizes and configurations

SKU: WBS-183663-4

  • 109.01 Save $36.34
    Unit price per 
Only 9999 left!
Shipping calculated at checkout.

Black wire shelving is powder coated wire shelving made to the same high-quality standards as our chrome wire shelving but is substantially less expensive. Durable powder coated finish is rust and chip resistant. An open design allows more air and light to pass through for added visibility and helps reduce a build-up of dirt and dust. Black wire shelving units are NSF Certified for dry storage making them an excellent choice for many different commercial and industrial applications. Easy to assemble without any special tools, these black wire shelving units are also easy to clean with warm water and dish soap. Be sure to dry thoroughly before adding product. Browse our large selection of sizes to find the ideal height and capacity to fit your needs. Each shelf will hold up to 350 lbs. of evenly distributed weight.

Shelf Size 18"D x 36"W
Unit Height 63"
Number of Shelves 4
SKU WBS-183663-4

Customer Reviews

Based on 5 reviews
80%
(4)
0%
(0)
0%
(0)
20%
(1)
0%
(0)
J
John
Expensive shipping

Shipping is way overpriced

B
Bryan Koenig
Bryan Koenig

Excellent product for the money

k
kevin evans

There percent easy to put together and can handle the weight the powder coating is great thanks buy rack

K
Karin Lind
Perfect for my frog

Nice sturdy shelf that fits my frog terrariums and supplies on it (: no instructions that I saw but I have a similar shekf and knew exactly how to put it together. Very easy.

M
Michael Rosenthal
Solid Unit

Shelving that beats those sold at Sam’s and Costco for looks and initial quality. Plus customer service when I needed a part was perfect.


Promotions, new products and sales. Directly to your inbox.